skip to main content

Case studies

Insight into the challenges, solutions, and successful implementations across our industries

  • Case study

    Yard switch heater and remote control - Amtrak Chicago

    The primary objective of this project was to modernize Chicago's Union Station, a facility that was dated in technology and struggled to manage the traffic volumes that were required.

    Placeholder for the imageAmtrak train yard.
  • Case study

    Yard automation - BNSF Alliance

    Revolutionising the routing through Powder River Basin.

    Placeholder for the imageOrange train in the snow.
  • Case study

    Heater control for switch and ballast - Path

    Controlling the temperature for the Port Authority of NY and NJ.

    Placeholder for the imageTrain yard.
  • Case study

    Long Beach Container Terminal (LBCT)

    Situated in the Port of Long Beach, next to the Port of Los Angeles, LBCT handles up to 3.3 million standard shipping containers of freight a year, which is then distributed across North America.

    Placeholder for the imageThe port of Long Beach, with a large cargo ship pulling out of port.
  • Case study

    Delay repay for Go-Ahead

    Go-Ahead approached iBlocks looking for a solution that could significantly reduce the cost of processing Delay Repay claims, reduce time from claim submission to award and flag fraudulent claims.

    Placeholder for the imageThamesLink Train adorned with rainbow graphics